Annual EBITDA
$170.59 M
-$16.42 M-8.78%
31 December 2023
Summary:
Granite Construction Incorporated annual earnings before interest, taxes, depreciation & amortization is currently $170.59 million, with the most recent change of -$16.42 million (-8.78%) on 31 December 2023. During the last 3 years, it has risen by +$25.62 million (+17.67%). GVA annual EBITDA is now -49.34% below its all-time high of $336.74 million, reached on 31 December 2008.GVA EBITDA Chart
Add series to chart(max: 6)
company, ETF, index, featured screener or watchlist
Quarterly EBITDA
$151.17 M
+$56.88 M+60.33%
30 September 2024
Summary:
Granite Construction Incorporated quarterly earnings before interest, taxes, depreciation & amortization is currently $151.17 million, with the most recent change of +$56.88 million (+60.33%) on 30 September 2024. Over the past year, it has increased by +$42.60 million (+39.24%). GVA quarterly EBITDA is now -2.28% below its all-time high of $154.70 million, reached on 30 September 1989.GVA Quarterly EBITDA Chart
Add series to chart(max: 6)
company, ETF, index, featured screener or watchlist
TTM EBITDA
$307.17 M
+$42.60 M+16.10%
30 September 2024
Summary:
Granite Construction Incorporated TTM earnings before interest, taxes, depreciation & amortization is currently $307.17 million, with the most recent change of +$42.60 million (+16.10%) on 30 September 2024. Over the past year, it has increased by +$151.81 million (+97.72%). GVA TTM EBITDA is now -8.11% below its all-time high of $334.30 million, reached on 31 March 2008.GVA TTM EBITDA Chart
Add series to chart(max: 6)
company, ETF, index, featured screener or watchlist
GVA EBITDA Performance
PeriodPeriod | AnnualAnnual | QuarterlyQuarterly | TTMTTM |
---|---|---|---|
1 y1 year | -8.8% | +39.2% | +97.7% |
3 y3 years | +17.7% | +102.6% | +130.6% |
5 y5 years | +26.9% | +63.8% | +475.4% |
GVA EBITDA High & Low
PeriodPeriod | Annual vs highAnnual vs high | Annual vs lowAnnual vs low | Quarter. vs highQuarter. vs high | Quarter. vs lowQuarter. vs low | TTM vs highTTM vs high | TTM vs lowTTM vs low | |
---|---|---|---|---|---|---|---|
3 y | 3 years | -8.8% | +17.7% | at high | +1298.1% | at high | +160.3% |
5 y | 5 years | -8.8% | +70.9% | at high | +378.9% | at high | +1053.8% |
alltime | all time | -49.3% | +868.4% | -2.3% | +147.1% | -8.1% | +251.4% |
Granite Construction Incorporated EBITDA History
Date | Annual | Quarterly | TTM |
---|---|---|---|
Sept 2024 | - | $151.17 M(+60.3%) | $307.17 M(+16.1%) |
June 2024 | - | $94.29 M(-5289.2%) | $264.57 M(+45.9%) |
Mar 2024 | - | -$1.82 M(-102.9%) | $181.39 M(+6.3%) |
Dec 2023 | $170.59 M(-8.8%) | $63.53 M(-41.5%) | $170.59 M(+9.8%) |
Sept 2023 | - | $108.57 M(+877.7%) | $155.35 M(+14.1%) |
June 2023 | - | $11.10 M(-188.0%) | $136.18 M(-21.2%) |
Mar 2023 | - | -$12.62 M(-126.1%) | $172.81 M(-7.6%) |
Dec 2022 | $187.01 M(+23.1%) | $48.30 M(-46.0%) | $187.01 M(+10.9%) |
Sept 2022 | - | $89.39 M(+87.3%) | $168.68 M(+9.6%) |
June 2022 | - | $47.74 M(+2923.2%) | $153.90 M(-11.4%) |
Mar 2022 | - | $1.58 M(-94.7%) | $173.79 M(+47.3%) |
Dec 2021 | $151.92 M(+4.8%) | $29.97 M(-59.8%) | $118.01 M(-11.4%) |
Sept 2021 | - | $74.61 M(+10.3%) | $133.21 M(+2408.6%) |
June 2021 | - | $67.63 M(-224.8%) | $5.31 M(-117.9%) |
Mar 2021 | - | -$54.20 M(-220.0%) | -$29.70 M(+1.4%) |
Dec 2020 | $144.97 M(+45.2%) | $45.17 M(-184.8%) | -$29.30 M(-9.0%) |
Sept 2020 | - | -$53.28 M(-263.4%) | -$32.21 M(-128.4%) |
June 2020 | - | $32.62 M(-160.6%) | $113.38 M(+25.9%) |
Mar 2020 | - | -$53.81 M(-227.3%) | $90.06 M(-9.8%) |
Dec 2019 | $99.82 M(-25.8%) | $42.27 M(-54.2%) | $99.82 M(+87.0%) |
Sept 2019 | - | $92.31 M(+893.5%) | $53.38 M(-21.0%) |
June 2019 | - | $9.29 M(-121.1%) | $67.58 M(-21.6%) |
Mar 2019 | - | -$44.04 M(+955.2%) | $86.25 M(-35.8%) |
Dec 2018 | $134.44 M(-7.5%) | -$4.17 M(-103.9%) | $134.44 M(-21.0%) |
Sept 2018 | - | $106.51 M(+281.0%) | $170.10 M(+11.2%) |
June 2018 | - | $27.95 M(+573.1%) | $152.93 M(-9.3%) |
Mar 2018 | - | $4.15 M(-86.8%) | $168.52 M(+15.9%) |
Dec 2017 | $145.42 M(-16.0%) | $31.48 M(-64.8%) | $145.42 M(-11.7%) |
Sept 2017 | - | $89.34 M(+105.1%) | $164.66 M(+9.6%) |
June 2017 | - | $43.55 M(-329.8%) | $150.28 M(-1.8%) |
Mar 2017 | - | -$18.95 M(-137.4%) | $153.05 M(-11.6%) |
Dec 2016 | $173.10 M(-4.9%) | $50.72 M(-32.3%) | $173.10 M(-10.6%) |
Sept 2016 | - | $74.96 M(+61.8%) | $193.64 M(+2.3%) |
June 2016 | - | $46.33 M(+4119.1%) | $189.21 M(+6.8%) |
Mar 2016 | - | $1.10 M(-98.5%) | $177.08 M(-2.7%) |
Dec 2015 | $181.99 M(+31.9%) | $71.25 M(+1.0%) | $181.99 M(+10.3%) |
Sept 2015 | - | $70.53 M(+106.2%) | $165.00 M(+22.0%) |
June 2015 | - | $34.20 M(+469.4%) | $135.24 M(-12.1%) |
Mar 2015 | - | $6.01 M(-88.9%) | $153.91 M(+11.5%) |
Dec 2014 | $138.01 M(+493.4%) | $54.26 M(+33.1%) | $138.01 M(+148.6%) |
Sept 2014 | - | $40.76 M(-22.9%) | $55.51 M(+10.2%) |
June 2014 | - | $52.88 M(-634.4%) | $50.39 M(+123.0%) |
Mar 2014 | - | -$9.89 M(-65.0%) | $22.60 M(-2.8%) |
Dec 2013 | $23.26 M(-84.3%) | -$28.23 M(-179.2%) | $23.26 M(-74.2%) |
Sept 2013 | - | $35.64 M(+42.1%) | $90.02 M(-32.8%) |
June 2013 | - | $25.09 M(-371.6%) | $133.88 M(+1.0%) |
Mar 2013 | - | -$9.24 M(-124.0%) | $132.57 M(-10.3%) |
Dec 2012 | $147.73 M(-7.9%) | $38.53 M(-51.5%) | $147.73 M(-9.3%) |
Sept 2012 | - | $79.50 M(+234.2%) | $162.94 M(+2.1%) |
June 2012 | - | $23.79 M(+301.5%) | $159.57 M(-0.3%) |
Mar 2012 | - | $5.92 M(-89.0%) | $160.10 M(-0.2%) |
Dec 2011 | $160.34 M(-822.2%) | $53.73 M(-29.4%) | $160.34 M(+413.2%) |
Sept 2011 | - | $76.13 M(+213.1%) | $31.24 M(+237.3%) |
June 2011 | - | $24.31 M(+294.2%) | $9.26 M(+34.0%) |
Mar 2011 | - | $6.17 M(-108.2%) | $6.91 M(-131.1%) |
Dec 2010 | -$22.20 M(-109.5%) | -$75.37 M(-239.2%) | -$22.20 M(-118.7%) |
Sept 2010 | - | $54.15 M(+146.6%) | $118.83 M(-14.0%) |
June 2010 | - | $21.96 M(-195.7%) | $138.14 M(-18.2%) |
Mar 2010 | - | -$22.95 M(-134.9%) | $168.93 M(-28.1%) |
Dec 2009 | $234.80 M(-30.3%) | $65.66 M(-10.6%) | $234.80 M(-10.0%) |
Sept 2009 | - | $73.46 M(+39.3%) | $260.76 M(-9.5%) |
June 2009 | - | $52.75 M(+22.9%) | $288.01 M(-6.0%) |
Mar 2009 | - | $42.93 M(-53.1%) | $306.24 M(-5.2%) |
Dec 2008 | $336.74 M(+17.4%) | $91.62 M(-9.0%) | $322.93 M(+0.8%) |
Sept 2008 | - | $100.72 M(+41.9%) | $320.38 M(+0.9%) |
June 2008 | - | $70.98 M(+19.1%) | $317.43 M(-5.0%) |
Mar 2008 | - | $59.62 M(-33.1%) | $334.30 M(+16.5%) |
Dec 2007 | $286.92 M(+81.8%) | $89.07 M(-8.9%) | $286.92 M(+35.7%) |
Sept 2007 | - | $97.76 M(+11.3%) | $211.47 M(+18.0%) |
June 2007 | - | $87.85 M(+617.9%) | $179.29 M(+14.2%) |
Mar 2007 | - | $12.24 M(-10.2%) | $157.03 M(-0.5%) |
Dec 2006 | $157.82 M | $13.62 M(-79.2%) | $157.82 M(-27.8%) |
Sept 2006 | - | $65.58 M(-0.0%) | $218.46 M(-6.7%) |
Date | Annual | Quarterly | TTM |
---|---|---|---|
June 2006 | - | $65.59 M(+403.4%) | $234.19 M(+8.2%) |
Mar 2006 | - | $13.03 M(-82.5%) | $216.54 M(+4.8%) |
Dec 2005 | $206.67 M(+35.9%) | $74.26 M(-8.7%) | $206.67 M(+23.3%) |
Sept 2005 | - | $81.32 M(+69.6%) | $167.66 M(+6.1%) |
June 2005 | - | $47.94 M(+1418.0%) | $158.08 M(+4.6%) |
Mar 2005 | - | $3.16 M(-91.0%) | $151.14 M(-0.6%) |
Dec 2004 | $152.02 M(+0.7%) | $35.25 M(-50.9%) | $152.02 M(-4.4%) |
Sept 2004 | - | $71.73 M(+74.9%) | $159.05 M(+8.4%) |
June 2004 | - | $41.00 M(+915.9%) | $146.74 M(+5.1%) |
Mar 2004 | - | $4.04 M(-90.5%) | $139.59 M(-7.5%) |
Dec 2003 | $150.93 M(+4.3%) | $42.28 M(-28.8%) | $150.93 M(+2.8%) |
Sept 2003 | - | $59.42 M(+75.5%) | $146.77 M(+4.8%) |
June 2003 | - | $33.85 M(+120.2%) | $140.07 M(-6.1%) |
Mar 2003 | - | $15.38 M(-59.7%) | $149.22 M(+3.1%) |
Dec 2002 | $144.71 M(+21.3%) | $38.12 M(-27.7%) | $144.71 M(+3.9%) |
Sept 2002 | - | $52.72 M(+22.6%) | $139.32 M(+7.0%) |
June 2002 | - | $43.01 M(+296.0%) | $130.19 M(+8.8%) |
Mar 2002 | - | $10.86 M(-66.8%) | $119.71 M(-9.3%) |
Dec 2001 | $119.32 M(-12.3%) | $32.72 M(-24.9%) | $131.99 M(-4.2%) |
Sept 2001 | - | $43.60 M(+34.0%) | $137.80 M(-4.0%) |
June 2001 | - | $32.53 M(+40.6%) | $143.61 M(-1.0%) |
Mar 2001 | - | $23.14 M(-40.0%) | $145.03 M(+6.6%) |
Dec 2000 | $136.10 M(+7.4%) | $38.54 M(-22.0%) | $136.10 M(+1.1%) |
Sept 2000 | - | $49.40 M(+45.5%) | $134.66 M(+4.4%) |
June 2000 | - | $33.95 M(+139.0%) | $128.96 M(+1.4%) |
Mar 2000 | - | $14.20 M(-61.7%) | $127.21 M(+0.4%) |
Dec 1999 | $126.70 M(+18.0%) | $37.10 M(-15.1%) | $126.71 M(+11.5%) |
Sept 1999 | - | $43.70 M(+35.7%) | $113.61 M(+2.4%) |
June 1999 | - | $32.20 M(+135.0%) | $110.90 M(0.0%) |
Mar 1999 | - | $13.70 M(-42.9%) | $110.90 M(+3.3%) |
Dec 1998 | $107.40 M(+40.8%) | $24.00 M(-41.5%) | $107.40 M(+7.5%) |
Sept 1998 | - | $41.00 M(+27.3%) | $99.90 M(+13.8%) |
June 1998 | - | $32.20 M(+215.7%) | $87.80 M(+12.7%) |
Mar 1998 | - | $10.20 M(-38.2%) | $77.90 M(+2.1%) |
Dec 1997 | $76.30 M(-0.7%) | $16.50 M(-42.9%) | $76.30 M(+3.8%) |
Sept 1997 | - | $28.90 M(+29.6%) | $73.50 M(-5.5%) |
June 1997 | - | $22.30 M(+159.3%) | $77.80 M(+0.6%) |
Mar 1997 | - | $8.60 M(-37.2%) | $77.30 M(+0.8%) |
Dec 1996 | $76.80 M(+2.5%) | $13.70 M(-58.7%) | $76.70 M(-5.4%) |
Sept 1996 | - | $33.20 M(+52.3%) | $81.10 M(+5.7%) |
June 1996 | - | $21.80 M(+172.5%) | $76.70 M(+1.9%) |
Mar 1996 | - | $8.00 M(-55.8%) | $75.30 M(+0.4%) |
Dec 1995 | $74.90 M(+41.6%) | $18.10 M(-37.2%) | $75.00 M(+10.3%) |
Sept 1995 | - | $28.80 M(+41.2%) | $68.00 M(+3.2%) |
June 1995 | - | $20.40 M(+164.9%) | $65.90 M(+13.8%) |
Mar 1995 | - | $7.70 M(-30.6%) | $57.90 M(+9.5%) |
Dec 1994 | $52.90 M(+81.8%) | $11.10 M(-58.4%) | $52.90 M(+2.1%) |
Sept 1994 | - | $26.70 M(+115.3%) | $51.80 M(+31.5%) |
June 1994 | - | $12.40 M(+359.3%) | $39.40 M(+18.3%) |
Mar 1994 | - | $2.70 M(-73.0%) | $33.30 M(+12.1%) |
Dec 1993 | $29.10 M(-2.0%) | $10.00 M(-30.1%) | $29.70 M(+9.6%) |
Sept 1993 | - | $14.30 M(+127.0%) | $27.10 M(+4.2%) |
June 1993 | - | $6.30 M(-800.0%) | $26.00 M(-11.9%) |
Mar 1993 | - | -$900.00 K(-112.2%) | $29.50 M(-1.7%) |
Dec 1992 | $29.70 M(-38.4%) | $7.40 M(-43.9%) | $30.00 M(-14.5%) |
Sept 1992 | - | $13.20 M(+34.7%) | $35.10 M(-9.3%) |
June 1992 | - | $9.80 M(-2550.0%) | $38.70 M(-11.8%) |
Mar 1992 | - | -$400.00 K(-103.2%) | $43.90 M(-8.7%) |
Dec 1991 | $48.20 M(-1.4%) | $12.50 M(-25.6%) | $48.10 M(-4.0%) |
Sept 1991 | - | $16.80 M(+12.0%) | $50.10 M(+2.0%) |
June 1991 | - | $15.00 M(+294.7%) | $49.10 M(+0.8%) |
Mar 1991 | - | $3.80 M(-73.8%) | $48.70 M(-63.3%) |
Dec 1990 | $48.90 M(+27.7%) | $14.50 M(-8.2%) | $132.70 M(-165.4%) |
Sept 1990 | - | $15.80 M(+8.2%) | -$202.90 M(+217.0%) |
June 1990 | - | $14.60 M(-83.4%) | -$64.00 M(-263.7%) |
Mar 1990 | - | $87.80 M(-127.3%) | $39.10 M(+106.9%) |
Dec 1989 | $38.30 M(-2.3%) | -$321.10 M(-307.6%) | $18.90 M(-54.3%) |
Sept 1989 | - | $154.70 M(+31.4%) | $41.40 M(+36.6%) |
June 1989 | - | $117.70 M(+74.1%) | $30.30 M(+68.3%) |
Mar 1989 | - | $67.60 M(-122.6%) | $18.00 M(-17.4%) |
Dec 1988 | $39.20 M | -$298.60 M(-307.9%) | $21.80 M(-93.2%) |
Sept 1988 | - | $143.60 M(+36.2%) | $320.40 M(+81.2%) |
June 1988 | - | $105.40 M(+47.6%) | $176.80 M(+147.6%) |
Mar 1988 | - | $71.40 M | $71.40 M |
FAQ
- What is Granite Construction Incorporated annual earnings before interest, taxes, depreciation & amortization?
- What is the all time high annual EBITDA for Granite Construction Incorporated?
- What is Granite Construction Incorporated annual EBITDA year-on-year change?
- What is Granite Construction Incorporated quarterly earnings before interest, taxes, depreciation & amortization?
- What is the all time high quarterly EBITDA for Granite Construction Incorporated?
- What is Granite Construction Incorporated quarterly EBITDA year-on-year change?
- What is Granite Construction Incorporated TTM earnings before interest, taxes, depreciation & amortization?
- What is the all time high TTM EBITDA for Granite Construction Incorporated?
- What is Granite Construction Incorporated TTM EBITDA year-on-year change?
What is Granite Construction Incorporated annual earnings before interest, taxes, depreciation & amortization?
The current annual EBITDA of GVA is $170.59 M
What is the all time high annual EBITDA for Granite Construction Incorporated?
Granite Construction Incorporated all-time high annual earnings before interest, taxes, depreciation & amortization is $336.74 M
What is Granite Construction Incorporated annual EBITDA year-on-year change?
Over the past year, GVA annual earnings before interest, taxes, depreciation & amortization has changed by -$16.42 M (-8.78%)
What is Granite Construction Incorporated quarterly earnings before interest, taxes, depreciation & amortization?
The current quarterly EBITDA of GVA is $151.17 M
What is the all time high quarterly EBITDA for Granite Construction Incorporated?
Granite Construction Incorporated all-time high quarterly earnings before interest, taxes, depreciation & amortization is $154.70 M
What is Granite Construction Incorporated quarterly EBITDA year-on-year change?
Over the past year, GVA quarterly earnings before interest, taxes, depreciation & amortization has changed by +$42.60 M (+39.24%)
What is Granite Construction Incorporated TTM earnings before interest, taxes, depreciation & amortization?
The current TTM EBITDA of GVA is $307.17 M
What is the all time high TTM EBITDA for Granite Construction Incorporated?
Granite Construction Incorporated all-time high TTM earnings before interest, taxes, depreciation & amortization is $334.30 M
What is Granite Construction Incorporated TTM EBITDA year-on-year change?
Over the past year, GVA TTM earnings before interest, taxes, depreciation & amortization has changed by +$151.81 M (+97.72%)